Property & investment · What a foreigner can buy
Can I buy land and have a house built?
The short answer
Yes, within an approved project or with the required authorisation. A non-citizen can buy a serviced plot in an IRS, PDS or Smart City project, then build on it within 5 years of the acquisition. Outside a project, the land requires a certificate from the Minister or approval under the resident route, and the house requires a building permit.
In detail
Two authorisations not to be confused
Having a house built requires two separate consents. The first concerns the right to acquire the land: it falls under the Non-Citizens (Property Restriction) Act. The second concerns the house: it falls under planning law. One does not replace the other.
Acquiring the plot
The simplest route is the serviced plot sold by a company holding a Smart City Scheme certificate (Finance Act 2020), extended to the Property Development Scheme by the Finance Act 2021: no certificate from the Minister is required to buy a plot intended for building a residence. The EDB guidelines on serviced land in a PDS project then govern the acquisition:
- the non-citizen acquires only one plot;
- the person already holds an IRS, RES, IHS or PDS residence permit, an occupation permit under section 12(1) of the Immigration Act, or a permanent residence permit;
- the plot does not exceed 2,100 m² in a PDS (0.5275 hectare in an IRS, with an amount of at least USD 350,000).
Outside these projects, bare land requires a certificate from the Minister, issued case by case, or the resident route at USD 500,000, with the Minister's approval, within the limit of 0.5276 hectare.
Building: obligations after the purchase
The guidelines require a dwelling to be built on the plot within 5 years of the acquisition, in line with the PDS company's architectural guidelines. A serviced plot cannot be sold or transferred until construction on it is completed. In a managed project, you also buy rules: heights, materials, style, deadlines. Read them before reserving the plot.
Planning permissions
Anyone wishing to build or demolish a building, or to develop land, submits an application for Outline Planning Permission or a Building and Land Use Permit to the district council or municipality (Local Government Act 2011, section 117). The Permits and Business Monitoring Committee has 14 working days from the actual receipt of the application to issue the permit or notify a reasoned refusal; the actual timeframe should be confirmed at the municipal counter. At the end of the works, the occupancy certificate is mandatory before living in the house.
For a plot from a subdivision, the subdivision permit determines what is actually serviced: roads, water, electricity, drainage. Ask for it, as well as the approved subdivision plan.
Checks before signing
- The land: nature (agricultural land cannot be built on without conversion), title, boundary survey by a sworn land surveyor, flood risk.
- Sanitation and utilities: mains drainage or septic tank, access, water, electricity.
- The duties: 5% registration duty payable by the buyer, 5% transfer tax payable by the seller.
How we support you
Before the deposit, we check the purchase framework of the plot and the route that applies to your situation. We organise viewings, with a full report for those who decide from a distance, and we prepare the file with you through to the deed at the notary's office.
6 official texts cited
Official sources
- Guidelines for Buyers of Residential Property under the IRS / RES / PDS (Jan. 2025)Economic Development Board Mauritius
- Finance (Miscellaneous Provisions) Act 2020National Assembly of Mauritius
- Non-Citizens (Property Restriction) ActAttorney General's Office — Revised Laws of Mauritius
- Finance (Miscellaneous Provisions) Act 2021National Assembly of Mauritius
- Registration Duty Act (version du 19/09/2026)Attorney General's Office / Registrar-General — Revised Laws of Mauritius
- Guidelines — Acquisition of residential property by non-citizen residents (minimum USD 500,000), sections 3(3)(d) et 3(3A) du NCPR ActPrime Minister's Office et Economic Development Board Mauritius